中文日韩字幕,日韩中文字幕在线有码视频网,日韩狠狠操,99香蕉精品视频在线观看,中文字幕高清有码在线中字,日韩视频中文字幕视频一区,亚洲免费专区

  Homepage      Favorite      中文版
Home About Us News info Products Services Recruitment Contact us
SERVICES
Marketing
After Services
Question
Downloads
CONTACT US
Headquarter: No. 18, Yangguang Road, Xinyang Industrial Area, Haicang, Xiamen, P.R.China 361022
Tel: +86-592-6539999
E-mail: bussiness@xmzzj.com

After Services
Location:Home → Services → After Services

Wheel Loader
To provide users with on-site services to help users conduct a comprehensive inspection and maintenance of the loader, "since the date of the sale of the machine within 12 months" or "the machine is running 2400 hours long" (in both cases in order to guarantee the arrival time of the first period ) to perform five compulsory maintenance, specific time: "The first strong protection", loaders run about 100 hours or 10 days; "second strong protection", loaders run 600 hours or 2-3 months; "third strong security, "loader running 1200 hours, or 5-6 months;" fourth strong guarantee "loader running 1800 hours, or 8-9 months;" fifth strong protection ", loaders run 2400 hours, or 11-12 months.

Excavator
To provide users with on-site services to help users conduct a comprehensive inspection and maintenance of the excavator, "since the date of the sale of the machine within 12 months" or "length of time the machine is running 2000 hours of" (in both cases in order to guarantee the arrival time of the first period ) to perform five compulsory maintenance, specific time: "The first strong security," excavator run about 100 hours or 10 days; "second strong security," excavator 500 hours or 2-3 months; "third strong security, "excavator running 1000 hours, or 5-6 months;" fourth strong security, "excavator running 1500 hours, or 8-9 months;" fifth strong security, "excavator operation 2000 hours, or 11-12 months.

Block Handling Wheel Loader
To provide users with on-site services to help users conduct a comprehensive inspection and maintenance of the loader, "from the date of sale of machines within six months" or "the machine is running 1200 hours long" (in both cases in order to guarantee the arrival time of the first period ) to perform three mandatory maintenance, specific time: "The first strong protection", loaders run about 100 hours or 10 days; "second strong protection", loaders run 600 hours or 2-3 months; "section three strong security, "loader running 1200 hours, or 5-6 months.


About Us
Company profile
Culture
Organizational
Development
Subsidiaries
Certificates
Products
Wheel Loader
Block Handling Wheel Loader
Excavator
Other
Spare Parts
News
Company News
Trade News
Exhibitions
Videos
Services
Marketing
After Services
Question
Downloads
Recruitment
Talent Concept
Jobs
Contact Us
Feedback
Contact us
Copyright 2014- (C) Xiamen Loaders Co., Ltd. All Rights Reserved.
Two-dimensional [Close]

點擊這里給我發(fā)消息
點擊這里給我發(fā)消息
阜阳市| 冷水江市| 龙山县| 樟树市| 普洱| 聂荣县| 从江县| 醴陵市| 胶南市| 山阳县| 合川市| 泗阳县| 武山县| 迁安市| 宜川县| 乐亭县| 武强县| 嘉善县| 武冈市| 缙云县| 乌拉特中旗| 正镶白旗| 犍为县| 泾阳县| 南平市| 砀山县| 太仆寺旗| 青海省| 武安市| 靖西县| 阜宁县| 平定县| 贞丰县| 启东市| 武功县| 深州市| 香格里拉县| 定边县| 北川| 蚌埠市| 平江县|